Intelligence Record

Drainage inspection — winter performance review

Estate ReviewDrainage inspection·Scotscraig Golf ClubClosed

Year-end review of phase 1 drainage performance with the Scotscraig greens team. Outflow readings confirm a 38% reduction in winter closure days; performance data underpins the phase 2 funding case.

Record date
20 May 2026
Recorded by
David Mirrey
Project Director, CalForth Construction
Intelligence source
Desk review
Course
Scotscraig Golf Club
Fife

Key Observations

Captured findings from the record

  • Note

    Phase 1 outflow readings within 4% of design model — performance validated.

  • Watch

    Lateral run on hole 10 — minor silt accumulation, schedule rod-and-jet before phase 2 mobilisation.

  • Note

    Member sentiment improved measurably; supports phase 2 internal narrative.

Supporting Photos

1 attached

Hole 13 fairway — winter standing water
Hole 13 fairway — winter standing water
05 Jun 2026

Activity History

Chronological record of this intelligence record

  1. 20 May 2026 13:00
    Performance review with Callum Bain
    David Mirrey
  2. 20 May 2026 17:00
    Record logged and closed
    David Mirrey