Detailed measured survey and equipment audit of the 1989 kitchen. Confirms cover capacity constraint and identifies extract, gas and floor-drainage works as critical-path items for the proposed scheme.
Record date
06 Jun 2026
Recorded by
Rosie Anderson
Interior Architect, John Frulani Architects
Intelligence source
Site survey
Course
Montrose Golf Links
Angus
Key Observations
Captured findings from the record
- Issue
Extract canopy — undersized for the proposed open-pass arrangement; full replacement required.
- Note
Gas supply — existing 32mm main adequate for stage 2 design; no upgrade required.
- Watch
Floor — slope to drain inconsistent in pot-wash area; remedial screed needed.
- Issue
Cold store — compressor end-of-life; recommend integration into refurbishment scope.
Activity History
Chronological record of this intelligence record
- 06 Jun 2026 11:00On-site measured surveyRosie Anderson
- 06 Jun 2026 18:45Record loggedRosie Anderson
- 07 Jun 2026 10:10Linked to kitchen concept decision d5Iain Buchanan
